You bring the site. We take care of your subdivision.
What we take care of. Drag, or use the arrow keys, to see more.How we take care of you
- 1
You deal with the director
Rahul, our director, is your point of contact from the first meeting to handover.
- 2
Your call returned the same business day
If we miss you, we’ll return your call that day. If your call is outside business hours, it’s the next business day.
- 3
Choices explained before we meet
We make the technical calls for you. When a choice comes down to your preference, you get a short memo at least 3 working days before we meet: what needs deciding, why it matters, and your options.
- 4
Meetings around your work
Meet in person during business hours, or by video call. We also offer video calls after hours, between 6pm and 7pm.
- 5
Nothing extra without your approval
If something needs to change, you get a variation request first: why it’s needed, what it costs, and what it means for timing and the rest of the project. Nothing goes ahead until you approve it.
- 6
Each payment, accounted for
Each monthly invoice comes with a payment claim. It lists each part of your contract, how far along it is, what’s been claimed so far and what’s left to claim.
- 7
Still here for 12 months
For 12 months after handover, we put right any defects you or your buyer raise. We deal with your buyer or property manager directly, so you’re not stuck in the middle.
Our guarantee
If we ever do extra work without your approval, you don’t pay for it.
How we deliver.
Great parts don’t make a great engine. How they fit together does.
Together for more than a decade.
Our team and partners have worked as one across our own, client and local authority projects. Your project isn’t where we learn to work together.
Approved means buildable.
We review the design and the construction side by side, so the plans council approves are plans that build well.
Tested before it’s built.
Your project is modelled in 3D, and each specialist tests it against their own discipline and the rules it has to meet for approval.
The buck stops with us.
Your design, build and sign-off all run through us, so when something comes up, we get it sorted and your project stays on track.
What some of the industry’s best say about working with us.
Sullivan Hall
“Sullivan Hall has worked with hpms on subdivision projects as a structural engineer and have always found the process smooth and professional. Communication is clear, and the information provided is well-prepared, which makes coordination straightforward. Their proactive approach helps keep projects on track.”
BCD Group
“Rahul from hpms was great to work with. He was extremely proactive in supplying all the necessary information we needed… and his broad knowledge of construction techniques was impressive.”
Your subdivision journey with us.
Two to three lot project completed in 18 to 24 months.
Feasibility
- Check zoning and overlays
- Topographical survey
- Geotechnical investigation
- Drain survey
- Arborist report
- Feasibility and budget
- Engage your consultants
Design
- Choose your direction
- Scheme plan
- Architectural design
- Planning assessment
- Stormwater design
- Civil engineering
- Structural engineering
- Fire design
- Approve the design
Consents
- Sign the applications
- Lodge Resource Consent
- Council requests for information
- Review draft consent conditions
- Engineering Plan Approval
- Lodge Building Consent
Site works
- Water and wastewater connections
- Power and fibre applications
- Tender the contractors
- Site set-up and fencing
- Erosion and sediment control
- Earthworks
- Drainage
- Retaining walls
- Shared driveway and vehicle crossing
- Council and engineer inspections
- Section 223 Approval
Build
- Choose your finishes
- Foundations
- Framing
- Roofing and cladding
- Plumbing and electrical
- Fit off
- Driveways
- Landscaping
- Council inspections
- Code Compliance Certificate
Titles
- Section 224(c) Certificate
- Settle your titles and any sales
Not one consent we’ve been responsible for has been declined.
A typical project, and not always in this order. Yours may need more or less involvement.

Your first step takes about 2 minutes.
See if your section can be subdivided. Free, on screen.